FEATURED PROJECT / EMERGENCY DAMAGE REPAIR
OISS Patroller II
ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING
Project
OISS Patroller II
Technical focus
Emergency Damage Repair
Scope
Emergency Hull Damage Repair
Documented fact
7-day recorded drydocking
01 / THE ASSIGNMENT
The project at a glance.
KME prepared repair drawings for client and ABS review, carried out bottom plate and bulkhead renewals and performed documented weld integrity and leak tests.
02 / TECHNICAL DELIVERY
Scope of work.
A concise breakdown of the principal repair and servicing activities documented for this assignment.
01
Damage response
Bottom plating and fuel tank bulkhead repairs
02
Planning
Repair drawings prepared for approval
03
Fabrication
Cropping, renewal and welding
04
Inspections
Ultrasonic, penetrant and vacuum testing
05
Testing
Fuel oil tank pressure testing
03 / FROM THE YARD
See the work behind the result.

The vessel during emergency docking

Original damage area

Completed docking works
7
days drydocking
04 / THE OUTCOME
A real project.
A tangible reference.
The presentation records docking on August 19 and undocking on August 26: a seven-day turnaround.
Project detail must be verified by the KME project manager before public launch.