A multidisciplinary special survey and drydocking assignment involving engine, propulsion, hull, valve and pipeline works.

ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING

 

Project
Mutawa 106
Technical focus
Integrated ship repair
Scope
Special Survey
Documented fact
12-day recorded completion

01 / THE ASSIGNMENT

The project at a glance.

Kingfisher coordinated major marine repair disciplines for the Mutawa 106 special survey. The recorded works included Caterpillar engine top overhauling, CPP overhauling, full hull blasting and painting, sea chest and overboard valve servicing, and pipeline renewal.


02 / TECHNICAL DELIVERY

Scope of work.

A concise breakdown of the principal repair and servicing activities documented for this assignment.

01

Engine overhaul

Caterpillar engine top overhaul

02

CPP system

CPP system overhauling

03

Hull preservation

Complete hull blasting and painting

04

Valves

Sea chest and overboard valve overhauling

05

Piping

Pipeline fabrication, galvanizing and installation

03 / FROM THE YARD

See the work behind the result.

Vessel during drydocking

Pipeline repair and renewal

Propulsion work during drydocking

12
days to complete

04 / THE OUTCOME

A real project.

A tangible reference.

Kingfisher’s company presentation records completion of the Mutawa 106 special survey and drydocking in 12 days.

Project detail must be verified by the KME project manager before public launch.

Have a similar vessel repair?