FEATURED PROJECT / SPECIAL SURVEY & DRYDOCKING
Mutawa 106
A multidisciplinary special survey and drydocking assignment involving engine, propulsion, hull, valve and pipeline works.
ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING
Project
Mutawa 106
Technical focus
Integrated ship repair
Scope
Special Survey
Documented fact
12-day recorded completion
01 / THE ASSIGNMENT
The project at a glance.
Kingfisher coordinated major marine repair disciplines for the Mutawa 106 special survey. The recorded works included Caterpillar engine top overhauling, CPP overhauling, full hull blasting and painting, sea chest and overboard valve servicing, and pipeline renewal.
02 / TECHNICAL DELIVERY
Scope of work.
A concise breakdown of the principal repair and servicing activities documented for this assignment.
01
Engine overhaul
Caterpillar engine top overhaul
02
CPP system
CPP system overhauling
03
Hull preservation
Complete hull blasting and painting
04
Valves
Sea chest and overboard valve overhauling
05
Piping
Pipeline fabrication, galvanizing and installation
03 / FROM THE YARD
See the work behind the result.

Vessel during drydocking

Pipeline repair and renewal

Propulsion work during drydocking
12
days to complete
04 / THE OUTCOME
A real project.
A tangible reference.
Kingfisher’s company presentation records completion of the Mutawa 106 special survey and drydocking in 12 days.
Project detail must be verified by the KME project manager before public launch.