FEATURED PROJECT / SPECIAL SURVEY & PROPULSION
Marcap Emdad 5
A 65-meter DP2 AHTS special survey with a substantial machinery and propulsion repair scope.
ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING
Project
Marcap Emdad 5
Technical focus
Special Survey & Propulsion
Scope
Special Survey & Propulsion
Documented fact
Complex multidisciplinary scope
01 / THE ASSIGNMENT
The project at a glance.
The documented technical scope included CPP and bow/stern thruster overhauls, thruster motor servicing, shaft alternator servicing, Fi-Fi pump work, steering gear cylinder servicing and machining of replacement rudder flap components.
02 / TECHNICAL DELIVERY
Scope of work.
A concise breakdown of the principal repair and servicing activities documented for this assignment.
01
Propulsion
CPP, bow and stern thruster overhauls
02
Electrical
Stern thruster motor rewinding & servicing
03
Auxiliary machinery
Shaft alternator and Fi-Fi pump servicing
04
Steering
Steering gear cylinder servicing
05
Machining
Fabricating and machining rudder flap bushes and pins
03 / FROM THE YARD
See the work behind the result.

Vessel during drydocking

Workshop repair activity

Mechanical servicing
DP2
AHTS special survey
04 / THE OUTCOME
A real project.
A tangible reference.
Featured to demonstrate the depth of KME’s integrated propulsion and mechanical servicing capabilities.
Project detail must be verified by the KME project manager before public launch.
Have a similar vessel repair?
Share your repair list, vessel particulars and schedule with our commercial team.