FEATURED PROJECT / SHAFT, PROPELLER & RUDDER
Al Fattan 11
Propulsion servicing for a 31.6-meter supply vessel.
ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING
Project
Al Fattan 11
Technical focus
Shaft, Propeller & Rudder
Scope
Propulsion Servicing
Documented fact
Tail shaft, propeller and rudder repairs
01 / THE ASSIGNMENT
The project at a glance.
The documented work included tail shaft removal, straightness inspection and polishing; propeller bend and pitting repair with static balancing; and rudder removal, calibration and polishing.
02 / TECHNICAL DELIVERY
Scope of work.
A concise breakdown of the principal repair and servicing activities documented for this assignment.
01
Shafting
Tail shaft removal, calibration and polishing
02
Propeller
Repair, testing and static balancing
03
Rudder
Rudder and stock servicing
03 / FROM THE YARD
See the work behind the result.

Propulsion works beneath vessel
31.6
metre vessel
04 / THE OUTCOME
A real project.
A tangible reference.
A technical example of Kingfisher’s tail shaft, propeller and rudder servicing capabilities.
Project detail must be verified by the KME project manager before public launch.
Have a similar vessel repair?
Share your repair list, vessel particulars and schedule with our commercial team.