Skip to Content



FEATURED PROJECT / SHAFT, PROPELLER & RUDDER

Al Fattan 11

Propulsion servicing for a 31.6-meter supply vessel.


ORIGINAL PROJECT PHOTOGRAPHY · KINGFISHER MARINE ENGINEERING

 

Project
Al Fattan 11
Technical focus
Shaft, Propeller & Rudder
Scope
Propulsion Servicing
Documented fact
Tail shaft, propeller and rudder repairs

01 / THE ASSIGNMENT

The project at a glance.

The documented work included tail shaft removal, straightness inspection and polishing; propeller bend and pitting repair with static balancing; and rudder removal, calibration and polishing.


02 / TECHNICAL DELIVERY

Scope of work.

A concise breakdown of the principal repair and servicing activities documented for this assignment.

01

Shafting

Tail shaft removal, calibration and polishing

02

Propeller

Repair, testing and static balancing

03

Rudder

Rudder and stock servicing

03 / FROM THE YARD

See the work behind the result.

Propulsion works beneath vessel

 31.6
metre vessel

04 / THE OUTCOME

A real project.

A tangible reference.

A technical example of Kingfisher’s tail shaft, propeller and rudder servicing capabilities.

Project detail must be verified by the KME project manager before public launch.

Have a similar vessel repair?

Share your repair list, vessel particulars and schedule with our commercial team.